Commercial Power Engineering - Substations Back

The increasing demand for electricity and the growing need for reliable power supply forces Utility companies to develop new energy facilities. Due to the age of the electrical power equipment operated in Poland, their modernisation or replacement has become the need. In the recent times, we have been observing the increase in such works in our portfolio. Some examples below.

110/15kV Electrical substation Piotrowiec
modernization

Employer: Energa Operator S.A.
Realization period: from April 2014 to September 2014
Scope of work:

110/15kV Anielina Station in Mińsk Mazowiecki
design + construction

Investor: PGE Dystrybucja S.A. Oddział Warszawa
Execution period: August 2012 – December 2013
Scope of work:

a) rain water collection with a reservoir-evaporator tank,

b) sewerage, with connection to the water supply and sewage system,

c) construction of the road exit and communication pathways on the station’s premises,

d) fencing, levelling and landscaping of the station’s premises,

e) construction of a regular energy building with AC, primary and auxiliary lighting and energy installations,

f) construction of an overhead 110 kV switching station in an H5 configuration with elevated device placement,

g) construction of two ecological oil pans for 110/15 kV 40 MVA transformers,

h) construction of oil pans for compensation bays for the station’s own needs with tracking compensation, and oil pans for capacitor bays,

i) construction of cable conduits,

j) construction of primary and secondary circuits,

k) installation of lighting and lightning protection on the station’s premises,

l) supply and start-up of the station’s AC, warranted AC, and DC systems with two 220 DC accumulator batteries,

m) supply and start-up of the station’s measuring system,

m) supply and start-up of the station’s communication system,

o) supply and start-up of the 110 kV switching station’s safety instrumented system,

p) construction and start-up of the facility’s telemechanic system,

r) supply and start-up of the MV switching station with a rated power of 2000 A, composed of 26 bays,

s) construction of station’s monitoring,

t) installation of neutral spans to the station’s gates from the existing power pylon, replacement of old lightning protection between the pylons with new OpGW wires, inserting then into the station’s gates and welding the fiber optic wires to the joint on the pylon,

u) connection of primary and secondary power transformers supplied by the Investor,

w) rewiring the low voltage line and lighting cable that collided with the entrance to the substation’s premises,

y) power supply to the MV/lV station from the new MV switching station,

 

110/15kV Electrical substation Łapy
modernization

Employer: PGE Dystrybucja S.A. Białystok Branch
Realization period: from August 2013 to March 2014
Scope of work:

110/15kV Electrical substation Nida
modernization

Employer: PGE Dystrybucja S.A. Białystok Branch
Realization period: from August 2013 to February 2014
Scope of work:

110/15kV Electrical substation Legionowo
modernization 
Employer: PGE Dystrybucja S.A. Warszawa Branch
Realization period: from September 2013 to February 2014
Scope of work:

110/15kV Electrical substation Łomianki
modernization

Employer: PGE Dystrybucja S.A. Warszawa Branch
Realization period: from September 2013 to December 2013
Scope of work:

110/15kV Electrical substation Zambrów
modernization

Employer: PGE Dystrybucja S.A. Białystok Branch
Realization period: from September 2012 to May 2013
Scope of work:

110/15kV Electrical substation Siemiatycze
modernization

Employer: PGE Dystrybucja S.A. Białystok Branch
Realization period: from September 2012 to May 2013
Scope of work:

110/15kV Electrical substation Łomża 1 and Łomża 2
modernization

Employer: PGE Dystrybucja S.A. Białystok Branch
Realization period: from July 2012 to February 2013
Scope of work:

110/15kV Electrical substation Radzymin
modernization

Employer: PGE Dystrybucja S.A. Warszawa Branch
Realization period: from June 2012 to December 2012
Scope of work:

110/15kV Electrical substation Babice
modernization

Employer: PGE Dystrybucja S.A. Warszawa Branch
Realization period: from June 2012 to December 2012
Scope of work:

RS network switching station of 15kV Szczuczyn
modernization

Employer: PGE Dystrybucja S.A. Białystok Branch
Realization period: from Mai 2010 to March 2011
Scope of work:
1.RS network switching station of 15kV with the electric and telecommunication equipment and systems, including:
– installation of the basic and emergency lighting
– installation of plug-in sockets
– installation of the electric heating system
– earth installation
– lightning protection system
– MV switchgear 15 kV
– transformers
– MV and LV cable lines – for supplying the equipment inside the switching station
– installation of the intrusion alarm system and fire protection system
– energy metering systems
– condenser battery for passive power compensation
2. Connection with the existing MV power system 15kV, including:
– construction of the MV cable line 15kV
– fibre-optic duct system
– reconstruction of the MV overhead line
3. Secondary circuits, protections and remote control engineering, including:
– remote control engineering, dispatching, radio and telephone communication
– secondary circuits
– auxiliaries 220V DC and 230V AC
4. Modernisation of the control station house, area lighting, area fencing, telephone terminal, including:
– replacement of the roofing
– building thermal insulation
– replacement of the entrance door
– painting of the interior
– laying the PVC floor covering
– replacement of the fencing
– disassembly of the existing control station racks
– installation of the basic lighting
– installation of plug-in sockets
– installation of the electric heating system
– LV cable line
– installation of the intrusion alarm system
– lighting of the area, telephone terminal